欢迎进Allbet欧博官网,欧博官网是欧博集团的官方网站。Allbet欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

首页体育正文

皇冠体育官网(www.hg108.vip):Fukushima debris removal delayed by another year

admin2022-08-285

皇冠体育官网www.hg108.vip)是一个开放皇冠正网即时比分、皇冠官方的平台。皇冠体育官网(www.hg108.vip)提供最新皇冠登录,皇冠体育官网包含新皇冠体育代理、会员APP,提供皇冠官网代理开户、皇冠官网会员开户业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠博彩www.hg9988.vip)是皇冠体育官方博彩平台,开放皇冠信博彩代理申请、博彩会员开户的线上博彩的官方平台。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

网友评论

最新评论